Unit 3 Robot Entry Video & New Enhanced Images

TEPCO sent robot Quince 2 into unit 3 at Daiichi to inspect the TIPS room. Damage to some of the electrical panels, water on the floors were found. The door for the hallway into the TIPS room was blown into the hallway, door frame and all. The mangled door can be seen blocking the end of the TIPS room hallway. The door frame in pieces with on on the floor in the foreground. The holes in the door frame piece match the holes in the concrete door way.

The video can be found here: http://www.youtube.com/watch?v=QIzAXojFLA0&feature=youtu.be
PDF document describing findings and radiation readings: handouts_120524_08-j

This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org

© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.

Editor

Editor, SimplyInfo.org

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: