Oops! Worker Bumps Reactor Water Valve At Fukushima Daiichi Changing Water Rate
A worker installing pipe insulation bumped a valve controlling the feedwater cooling for unit 3 at Fukushima Daiichi. This increased the water injection rate to 7 tons per hour from 5.8 tons per hour. Once it was discovered workers adjusted the valve back down.
Such events highlight the fragile nature of the plant where critical systems have no protection or safety systems.
This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org
© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved
Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.