Photos: New Images From Fukushima Daiichi Press Tour
These images were released by the press pool and show the current conditions of Fukushima Daiichi. There are also some fly over shots that show the extent of the expansion around the plant of tanks and other storage.
ALPS decontamination system under construction
Cask storage facility under construction
Common Pool Feb 2013
Debris still tangled on the sea front 2013
Overview of the plant, units 1-4 left to right 2013
The growing expanse of tanks 2013
Units 4-1 left to right
Overhead view of the growing facility 2013
Checking bus for radiation Feb 2013 at J Village
Unit 4 de-fueling building under construction 2013
Unit 4 de-fueling building under construction 2013
Overhead view of unit 4 stripped down. Reactor well and tool pit visible and full of water. Spent fuel pool at the top covered with steel sheet and floating cover.
Construction on unit 4’s defueling building
2012 dismantling of unit 4 refueling floor
This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org
© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved
Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.
Pingback: Useless Nuclear Disaster Information! — [Fukushima Update - February 2013] | Not all alleged is apparent…