Unit 3 Spent Fuel Pool; Debris Removal Preparation Begins
Kyodo News announced yesterday that preparations are underway to remove the debris from the unit 3 spent fuel pool at Fukushima Daiichi. The debris in unit 3’s spent fuel pool is much more excessive and complicated than unit 4. In unit 3’s pool is a tangle of rebar and concrete along with the refueling crane. The refueling crane apparently fell in the pool during the explosion. One end landed on the fuel racks.
Along with the effort to prepare for debris removal workers dropped an underwater camera in the pool after both the main cable and back up cable on the crane failed.
This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org
© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved
Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.