TEPCO Begins Decontamination Of Unit 3 First Floor

u3_firstfloor_140620_06TEPCO has begun the further decontamination of the first floor of unit 3. Robots Meister and Sora are doing the work, Meister is hooked to a vacuum collector rig outside the building. Misc debris not already removed is being collected and some surface cleaning is being done. This is an attempt to lower contamination levels further to allow human sustained entry into the building.

http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2014/images/handouts_140620_06-e.pdf

This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org

© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.

Editor

Editor, SimplyInfo.org

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: