Fukushima Unit 5 Continues Alternate Cooling

Unit 5 continues to operate on shared cooling with the reactor vessel. Graphs of hourly temperature data pulled today show again, the back and forth trend in temperature changes as they shift cooling between the vessel and the pool. The high temperature seen in the RPV graph is 42.5c. Also mentioned today in TEPCO’s daily reports, unit 6 has returned to cooling the spent fuel pool after a short outage to test the fuel gate.

u5_rpv_cooling_july_12_2014  RPV (reactor) temps u5_sfp_temps_july_12_2014 Spent fuel pool temperature graph

This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org

© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.

Editor

Editor, SimplyInfo.org

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: