Fukushima Groundwater Bypass Not Working As Planned
NHK is reporting that the groundwater bypass system being used by TEPCO isn’t making a significant change in groundwater levels near the reactors. Monitoring wells showed only about a 10 centimeter drop over the last two months. Regulators asked TEPCO to gather more data.
The current bypass system is quite small, removing only 100 tons of the daily 400 tons of incoming groundwater. This system is also near the reactors being located directly uphill near the buildings. Our research team and others suggested to IRID that a much larger bypass system would be needed and it should be installed further inland of the plant to encircle the facility. This plan was approved by IRID but never actually implemented by METI or TEPCO.
image credit | 281antinuke
This article would not be possible without the extensive efforts of the SimplyInfo research team
Join the conversation at chat.simplyinfo.org
© 2011-2023 SimplyInfo.org, Fukuleaks.org All Rights Reserved
Content cited, quoted etc. from other sources is under the respective rights of that content owner. If you are viewing this page on any website other than http://www.simplyinfo.org (or http://www.fukuleaks.org) it may be plagiarized, please let us know. If you wish to reproduce any of our content in full or in more than a phrase or quote, please contact us first to obtain permission.