Fukushima Unit 1 Refueling Floor Inspection Results
Investigations of the unit 1 refueling floor area took place between November 2016 and February 2017. This area has been
Read moreInvestigations of the unit 1 refueling floor area took place between November 2016 and February 2017. This area has been
Read moreForest fires in Namie, Fukushima within the areas of highest contamination dubbed the “difficult to return zone” have burned since
Read moreTEPCO has been quite secretive about the decommissioning work for unit 2’s refueling floor. A platform has been under construction
Read moreThe newly elected governor of Niigata has effectively put a stop to the new TEPCO attempt to restart the massive
Read moreTEPCO published press handouts that there will be a muon scan of Fukushima unit 3 starting in May of 2017.
Read moreReconstruction minister Masahiro Imamura has resigned after another insulting remark about people in Fukushima and the Tohoku region. During a party
Read moreGE Hitachi and IRID have published photos and basic information about a new mock-up model for one of the Fukushima
Read moreJapan’s government has used 2017 as the year they pretend the Fukushima disaster is over. Compensation and housing programs are
Read moreIRID has released additional details about the damage found inside unit 2 on the recent inspections of the containment structures. A
Read moreSimplyInfo.org 2017 Report; Food And Environmental Contamination Related To The Fukushima Nuclear Disaster Over the last six years understanding
Read moreTEPCO has completed a multiple day inspection of unit 1 at Fukushima Daiichi. This new work used the PMORPH robot
Read moreA group of evacuees had sued both TEPCO and the Japanese government in Maebashi District Court. The ruling is the first
Read moreOur 6th Anniversary report is now available in the following options: Buy it on Amazon here. It can also be
Read moreQuietly buried in technical reports was this interesting plan. Researchers have developed a method to tunnel under the reactor buildings
Read moreOur Fukushima 6th Anniversary Report is now available here. We cover the technical, environmental and humanitarian evolution of the disaster
Read moreA new quadcopter drone has been introduced for use at Fukushima Daiichi. The RISER quadcopter is currently in use to
Read moreWhile the press reported Scorpion’s mission as a failure, it did provide useful data before being abandoned. The robot appears
Read moreThe Scorpion robot entered Fukushima unit 2 containment today and sent back a set of images. TEPCO’s reporting was scant
Read moreAn improved version of the Hitachi shape changing robot previously used at unit 1 has been unveiled by IRID. The
Read moreAsahi Shimbun has announced that the Scorpion robot (aka: Sasori) will attempt to enter unit 2’s containment structure by the
Read morePreparation work with a cleaning robot was abruptly abandoned today. This cleaning robot was preparing an area for the Scorpion robot to
Read moreTEPCO has provided more information on the exact location and nature of these radiation readings provided to the press late
Read moreThere have been news reports going around claiming there were “spikes” of radiation at Fukushima Daiichi and attributing this to
Read moreTEPCO released further information on the scope inspection of unit 2. This included confirmation that our previous estimations of the
Read moreNHK produced a stitched together photo of a 2 meter wide hole found in the pedestal area of Fukushima Daiichi
Read moreTEPCO released photos and video of the preliminary scope work inside unit 2’s containment. The first set looked at the
Read moreTEPCO announced that they would further delay spent fuel removal at unit 3, citing high radiation levels. Spent fuel removal
Read moreThis map of the frozen wall, published January 17th shows the current status of the project. Most of the sea
Read moreA new report out of TEPCO and the various parties involved in decommissioning documents that 15 workers from Fukushima Daiichi
Read moreThe cover building installation for unit 3 is currently underway. A TEPCO handout from January 17th shows a “stopper” bracket
Read moreTEPCO relayed verbally in the Monday press conference that the initial phase of the inspection of unit 2 containment will
Read moreJapan’s Environment Ministry had a plan. They were going to solve the problem of the massive piles of radioactive soil
Read moreIRID released a report late in December, 2016 that outlines in great detail, the technical tasks involved in the upcoming
Read moreWild boar are a problem across Japan, damaging crops and showing up in populated areas. The boar in Fukushima are
Read moreRecent meetings that included TEPCO and Japan’s NRA debated the impact of the frozen wall on groundwater levels at the
Read moreA public meeting on the Taiwan government’s plan to ease a food ban on prefectures in Japan impacted by the
Read moreTEPCO published a photo with a short explanation and no handout document. The image shows what TEPCO describes as a
Read moreNews began showing up earlier this week claiming they were going to send a mech style robot to work at
Read moreJapan’s prime minister Shinzo Abe was one of the first foreign leaders to scurry to New York to meet with
Read moreAs of early December 2016 there were more than 9 million radioactive waste bags piled up in Fukushima prefecture alone.
Read more