Fukushima Unit 1 New “Plan B” To Remove Spent Fuel

TEPCO has added an additional option to their plans for the removal of spent fuel from unit 1 at Fukushima

Read more

Fukushima Unit 3 Spent Fuel Damage Identified

TEPCO has identified twelve fuel assemblies with damaged lifting handles. Further damage can not be identified at this point as

Read more

Fukushima Unit 6 Cooling Pump Fails

An RHR (reactor heat removal) pump at Fukushima Daiichi unit 6 failed on  November 19th. The suppression chamber suction valve

Read more

Fukushima Unit 2 Has A Spent Fuel Removal Plan

TEPCO and the NDF have released documentation describing their plan to remove both the spent fuel and at least some

Read more

Fukushima Unit 1 Containment Inspection Update

Plans to inspect inside the containment structure of unit 1 at Fukushima Daiichi has again hit a series of delays.

Read more

Fuel Removal Technology Given A Test Run At Fukushima Daiichi

The “muscle robot” technology developed to potentially remove fuel debris from reactors at Fukushima Daiichi is being given a test

Read more

Fukushima Unit 1-2 Vent Tower Progress Update

The unit 1-2 vent tower at Fukushima Daiichi is the most dangerous location on site outside of the reactor buildings.

Read more

91 Bags Of Contaminated Fukushima Soil Washed Away In Typhoon

NHK is reporting that 90 bags of contaminated soil floated away in a river during Typhoon Hagibis. 25 of those

Read more

SimplyInfo.org; Unit 1 Interim Report 2019

A number of new events tied to unit 1 have taken place. These lend new insight into the initial disaster

Read more

Fukushima Nuclear Fuel Imaging Tool Created For Under $150

Researchers developed a 3D imaging system that could be used to located Fukushima’s melted nuclear fuel for under $150 using

Read more

Fukushima Daiichi Typhoon Hagibis Damage Update 10.15.19

New report of landslides at Fukushima Daiichi: TEPCO reports today that some minor landslides due to the recent typhoon were

Read more

Extremely Strong Typhoon Headed For Fukushima Daiichi

An extremely strong typhoon is headed directly at Fukushima Daiichi. Typhoon Hagibis is currently making landfall near Tokyo and Chiba

Read more

SimplyInfo.org; A Fukushima Update 10.10.19

We round up recent news from Fukushima Daiichi and related events. TEPCO has continued to delay the completion of a

Read more

Fukushima Disaster At Center Of Evolving South Korea vs. Japan Feud

Diplomatic relations between the two countries have been problematic in recent years. Fights over WWII human rights abuses, trade disputes

Read more

Fukushima Unit 1 Reactor Well Inspection Results

The inspection of the unit 1 reactor well began in July, continuing into the end of August. A trio of

Read more

TEPCO Uses New Laser Decontamination System At Fukushima Daiichi

TEPCO has deployed a laser decontamination system at Fukushima Daiichi. This new system is currently being used to decontaminate the

Read more

Demolition Rig For Fukushima Vent Tower Has 3 Failures

The remote cutting rig for dismantling the highly contaminated unit 1-2 vent tower has had three failures since it began

Read more

Fukushima Daiichi Contract Workers Receive Medical Checks

TEPCO is providing health checks on current and former contract workers at Fukushima Daiichi. The report appears to indicate this

Read more

Fukushima Unit 1; Site Of Significant New Work

Fukushima Unit 1 has been the site of significant new work on multiple fronts. We outline the new events and

Read more

Reactor Well Inspections Start At Fukushima Unit 1

TEPCO published preliminary photos July 18th showing the start of inspection work of the reactor well for unit 1. Two

Read more

TEPCO Confirms Fuel Microparticles At Daiichi Reactors

TEPCO has confirmed new details about the existence of fuel microparticles at the three reactors that suffered meltdowns. Deeper detail

Read more

Workers Enter Fukushima Electrical Room In Socks, Get Contaminated

This unusual event at Fukushima Daiichi took place in early June. Workers entered a 2nd floor electrical room in the

Read more

How Work To Remove A Radioactive Tower At Fukushima Daiichi Went Wrong

Measure twice, cut once. Work to remove the highly contaminated units 1-2 vent tower at Fukushima Daiichi took an unfortunate

Read more

Fukushima Unit 2 Spent Fuel Removal Plan May Drastically Change

TEPCO previously announced their plan for removing spent fuel from unit 2 at Fukushima Daiichi. This involved removing the roof

Read more

New Discovery At Fukushima Unit 3 Provides Clues To Meltdown Severity, Environmental Releases

TEPCO recently published a video of the work to remove spent fuel from the unit 3 fuel pool. In this

Read more

SimplyInfo.org; New Clues To Melt Through At Unit 2

As we work through refining what took place at Fukushima Daiichi, old data can have new meaning in light of

Read more

TEPCO Confirms Our Theory On Fukushima Unit 2

Revelations documented by The Mainichi from a late March press conference by TEPCO confirm our theories on unit 2. We

Read more

Fukushima Unit 2; New Containment Panorama Photos

A pair of new panoramic photos from inside Fukushima unit 2’s containment have been published. TEPCO provided the photos as

Read more

Fukushima Unit 1 Upcoming Inspection; What You Need To Know

TEPCO and the various entities tasked with dealing with the disaster clean up at Fukushima Daiichi have announced details of

Read more