Fukushima News Roundup June 18, 2013
The NRA has announced that they do not consider quake damage to be the cause of the isolation condenser failure
Read moreThe NRA has announced that they do not consider quake damage to be the cause of the isolation condenser failure
Read moreFukushima worker Happy wrote extensively yesterday on Twitter about what he sees as some considerable risks with the upcoming work
Read moreTEPCO admits a math error led to wrong estimate of unit 2 reactor pressure at the height of the
Read moreTEPCO asks for more money, fishermen still can’t fish in today’s news roundup. (graphic by 281_antinuke) TEPCO asks for another
Read moreTEPCO has announced the completion of the frame for the unit 4 defueling building. The handout shows at least some
Read moreTEPCO’s stock does a dive and Fukushima has far reaching impact on uranium industry worldwide. TEPCO’s stock shot up last
Read moreTEPCO conducted a “terror drill” at the Daini nuclear plant where they simulated an attack on a plant. This is
Read moreTEPCO will remove the cover on unit 1 at Fukushima Daiichi this fall. The cover was hastily put over the
Read moreTEPCO sent a pair of robots in to inspect the personnel access hatch for unit 1 recently. Upon reviewing the
Read moreTEPCO did a robot inspection of the MSIV room of unit 2. No video of the work has been released
Read moreTEPCO is still not ruling out the option of dumping radioactive water into the ocean. Something that would cause obvious
Read moreTEPCO has completed the last portion of the investigation of the torus and downcomer pipes in unit 2. The walking
Read moreThis is part three of our three part series on the second year of the 3-11 disaster. In part three
Read moreTEPCO sent the unnamed walker bot back into unit 2’s torus room for another inspection effort. This trip looked at
Read moreTEPCO announced a plan that should enable them to look inside unit 2 and inspect the reactor vessel directly. TEPCO
Read moreTEPCO has been trying to insert a new thermometer into the unit 2 reactor vessel by way of the TIPS
Read moreA quick wrap up of some notable news at Fukushima Daiichi and related events around Japan: A government panel that
Read moreTEPCO recently inspected the unit 1 torus room for a second time as we reported here. Workers involved in the
Read moreNew work done around February 21 to 22 has been posted by TEPCO and confirmed by workers. The newest work
Read moreFukushima Unit 4 Spent Fuel Won’t Melt if Spent Fuel Pool Drains by Dean Wilkie fukuleaks.org/web has written several articles
Read moreIn a new video release by TEPCO, managers discussed venting the unit 1 reactor again almost two weeks after the
Read moreTEPCO’s air testing near each reactor unit produced an interesting situation. The readings were taken at the same locations at
Read moreReuters is reporting that the two operating reactors at the Oi nuclear plant in Japan will have to shut down
Read morefukuleaks.org/web has released another new paper taking an in depth look into the ongoing challenges at the Fukushima Daiichi nuclear
Read moreThis paper also available in PDF format for download and book readers. Gamma Radiation Damage To Fukushima Units 1
Read moreOur ongoing research of the disaster at Fukushima Daiichi has found some additional insight into the explosion events at unit
Read moreAvailable as a PDF for download or ebook readers Causes of Unit 4 Explosion Revisited Overview One of the
Read moreThis set of modeling images were taken from an NHK documentary. A group of researchers modeled the releases of iodine
Read moreTEPCO released a brief handout and photo showing the progress made so far in constructing the cover building at unit
Read moreA recent report by Sandia National Lab indicated that about 140,000kg of melted fuel and debris was released out of
Read moreFrom today’s TEPCO report, they intend to restart nitrogen injection into the torus (suppression chamber). This has been done frequently
Read moreWorker Happy, mentions that the installation of the cover building columns is beginning at Fukushima Daiichi. (machine translation) “Could they
Read moreNHK reports 300,000 are still in temporary housing after the March 2011 disaster. Japan Today cites a number of 305,000
Read moreThe power companies in Japan are already demanding reactor restarts after the LDP won the election. via Jiji This article
Read moreTEPCO did inspection work at Unit 2 in the torus with the Toshiba walker-bot (it doesn’t have a name apparently)
Read moreWe have reported extensively about a phenomenon going on inside unit 1 since the accident. Whenever there is a strong
Read moreUPDATE: 3:45am GMT Dec 8th; USGS scientists say this may be part of the aftershocks from the March 2011 big
Read moreReuters is reporting no timeline for restarting unit 1 at Salem after a high wave from hurricane Sandy took out
Read moreTEPCO has admitted a 4th worker was highly exposed in the turbine building basement of unit 3. He received 56
Read moreTEPCO’s lightbulb balloon inspection of the refueling floor did result in some interesting findings. The overhead crane was found to
Read more