Fukushima Unit 3-4 Vent Tower To Come Down In 2022

TEPCO documented that the unit 3-4 shared vent tower at Fukushima Daiichi will be removed in 2022. The information was

Read more

Workers Enter Fukushima Electrical Room In Socks, Get Contaminated

This unusual event at Fukushima Daiichi took place in early June. Workers entered a 2nd floor electrical room in the

Read more

TEPCO Begins Concreting Unit 4 Trench At Fukushima Daiichi

TEPCO has begun concreting in the seawater piping trench for unit 4 at Fukushima Daiichi. The work has been on

Read more

Fukushima Unit 4; 11 Spent Fuel Assemblies Left To Remove From Pool

There are now 11 spent fuel assembles left in the damaged unit 4 spent fuel pool. The other remaining assemblies

Read more

Fukushima Daiichi Unit 4; 1298 Assemblies Removed

Unit 4 spent fuel removal is at 1298 assemblies removed as of this week. http://www.tepco.co.jp/en/decommision/index-e.html This article would not be

Read more

Fukushima Daiichi Unit 4; 1078 Fuel Assemblies Removed

1078 fuel assemblies have been removed from unit 4 and transferred to the common pool. http://www.tepco.co.jp/en/decommision/index-e.html This article would not

Read more

Fukushima Unit 4; 968 Fuel Assemblies Removed

968 fuel assemblies have been removed from the unit 4 spent fuel pool to the common pool. http://www.tepco.co.jp/en/decommision/index-e.html This article

Read more

Fukushima Unit 4 Fuel Inspection Shows Some More Damaged

TEPCO released a small selection of images of some of the fuel removed from the unit 4 spent fuel pool.

Read more

Fukushima Unit 4; 594 Fuel Assemblies Removed

594 fuel assemblies have been removed to the common pool from unit 4’s spent fuel pool. http://www.tepco.co.jp/en/decommision/index-e.html   This article

Read more

Fukushima Unit 4 Fuel Removal Delayed 1 Week Due To Crane Failure

The control mechanism for the overhead crane in the defueling building at Fukushima Daiichi unit 1 failed. TEPCO is reporting

Read more