Analysis: Unit 3 Mast In Pool Inspection

TEPCO released a new video and handout of the unit 3 mast that fell deeper into the spent fuel pool.

Read more

Unit 3 Daiichi Pool Accident Analysis

TEPCO announced this week that the 1.5 ton mast for the refueling crane fell into the pool and sank as

Read more

Robot Inspection Of Unit 3 Finds Increasing Radiation Levels, New Robot Fails.

TEPCO reports the results of a robot inspection in unit 3 at Fukushima Daiichi. The initial work was to look

Read more

Fukushima Unit 3 steam-explosion theory

Fukushima Unit 3 steam-explosion theory by Ian Goddard   The signature event of the Fukushima nuclear meltdowns was the large mushroom-cloud explosion

Read more

Fukushima Daiichi Intended To Increase MOX Use In Unit 3

Editors note: Documentation TEPCO #1 Documentation TEPCO #2 Preliminary Analysis of Tepco Documentation 3-2 “Tokyo Electric Power Co., Inc. Fukushima

Read more

TEPCO Releases Document Claiming Unit 3 Blew Up Unit 4

TEPCO released a schematic claiming it explains that unit 3 caused the explosion in unit 4. It shows high radiation

Read more

Update: Fukushima Unit 1 & 3 Containment Leaks

New information was published by TEPCO updating details about the new containment water leaks caused by the February earthquake. At

Read more

Fukushima Unit 5 Alternate Cooling, No ETA For System Repair; July 13, 2014

TEPCO still has not given any further information about the needed repair of the leaking valve for the main cooling

Read more

Fukushima Unit 4; 308 Fuel Assemblies Removed

308 assemblies have been removed from the unit 4 spent fuel pool. The assemblies were transferred to the common pool

Read more