TEPCO New Video; Unit 1 Needed Venting Again Weeks After Disaster
In a new video release by TEPCO, managers discussed venting the unit 1 reactor again almost two weeks after the
Read moreIn a new video release by TEPCO, managers discussed venting the unit 1 reactor again almost two weeks after the
Read morefukuleaks.org/web has released another new paper taking an in depth look into the ongoing challenges at the Fukushima Daiichi nuclear
Read moreA recent report by Sandia National Lab indicated that about 140,000kg of melted fuel and debris was released out of
Read moreFrom today’s TEPCO report, they intend to restart nitrogen injection into the torus (suppression chamber). This has been done frequently
Read moreThe NRA announced recently that reactors built before 1975 likely have sub standard fire protection designs. This includes having important
Read moreWe have reported extensively about a phenomenon going on inside unit 1 since the accident. Whenever there is a strong
Read moreHydrogen in the containment of unit 1 has continued to be elevated as they work to purge hydrogen from the
Read moreTEPCO’s lightbulb balloon inspection of the refueling floor did result in some interesting findings. The overhead crane was found to
Read moreThis was initially reported in a TEPCO roadmap report that they were monitoring a pocket of hydrogen that has developed
Read moreTEPCO did another inspection of unit 1. They previously used a balloon that looked like a beach ball to float
Read moreTEPCO posted a section in a larger roadmap in Japanese about an investigation into the torus of unit 1 over
Read moreLast night Yushi (@Yuushi420) reported fire trucks headed somewhere through Okuma and Tomioka. “bus home from 1F. I passed quite
Read moreVideos released by TEPCO yesterday included a scope investigation underwater. The water itself was surprisingly clear with a small layer
Read moreUpdate: The source for unit 1 torus radiation had an incorrect link. The correct link has been added to the
Read moreTEPCO has released more information about the ongoing inspection of unit 1 this week. Water was found inside at about
Read moreThe initial inspection today of unit 1 containment was unable to find the water level inside containment according to 47
Read moreKyodo News is reporting TEPCO will do a series of inspections this week at unit 1 to look inside containment
Read moreWorkers did a brief inspection inside the containment of unit 1 earlier this week. We reported the initial findings yesterday.
Read moreTEPCO installed an inspection hole in containment penetration X-100B above the equipment hatch near the monorail. They took a brief
Read moreOn September 5th hydrogen concentrations in Unit 1 jumped to .54%, the reading the previous day showed 0% hydrogen for
Read moreTEPCO has announced they will send robots into unit 1’s TIPS room. A previous set of radiation readings from October
Read moreThe SimplyInfo team has been reviewing TEPCO’s latest effort to inspect unit 1 at Fukushima Daiichi. Work was done by
Read moreUnit 1 video from October 2011. Click on the images for larger versions. They seem to spend lots of time
Read moreVideo has been released of the an extended entry into unit 1 on October 18th. Previously, workers had expressed concerns
Read moreTEPCO has admitted to the issue of steam leaking out of the ground around Unit 1. Water in the basement
Read moreThis article would not be possible without the extensive efforts of the SimplyInfo research team Join the conversation at chat.simplyinfo.org
Read moreThe presence of the TEPCO live webcam of the Daiichi site has allowed us to watch the slow process of
Read moreWe documented in mid-August that the melted reactor fuel (corium) may have relocated and could be leaving the unit 1
Read morefukuleaks.org/web researcher Elaine Kirk found this image that was posted on the TEPCO website on June 14th of Unit #1
Read more