NRA Volcano Review Of Nuclear Safety Abruptly Exposes Reality
NRA began their review of nuclear safety related to volcano’s this week. This would be considered a good thing for
Read moreNRA began their review of nuclear safety related to volcano’s this week. This would be considered a good thing for
Read moreA sample testing box set was tested at JAEA’s Tokai reactor in late July. The tests helped them come up
Read moreAnother periodic report from the Fukushima Health Survey has found more thyroid cancers in children. Another 14 cancers were confirmed
Read moreThe Japanese government has announced that all 20 hours of Masao Yoshida’s testimony about the Fukushima nuclear disaster will be
Read moreJapan’s NRA has established a panel to investigate volcano risks to nuclear plants, on the heels of their claim that
Read more“Father, Mother, please forgive me for dying before I could fulfill my duty as a son. After the earthquake, I
Read moreKyodo News is running a series of articles based on some of the official testimony of Fukushima Daiichi workers. These
Read moreA rough translation of the NHK article tells something almost unbelievable to see admitted by the state news agency. “It
Read moreJapan’s central government to offer 300 billion yen over 30 years for towns near Fukushima Daiichi to host nuclear debris
Read moreTEPCO announced this week that they wanted to begin pumping up water from the sub drains near the reactor buildings.
Read moreA study of the tsunami risk at Diablo Canyon nuclear plant in California has been raising questions about NRC’s honesty
Read moreAs part of TEPCO’s admission that 100% of the unit 3 core has melted and left the reactor vessel, they
Read moreTEPCO has admitted that the fuel at unit 3 had a complete melt through. This is where 100% of the
Read moreHitachi GE conducted robot investigations into unit 2’s torus room on July 17th. The main focus of the work was
Read moreTEPCO released a short handout this week that explains their plan for removing the damaged fuel at unit 4. One
Read moreTEPCO hopes to have two new installations of ALPS completed in September and October of this year. The company is
Read moreAfter weeks of unit 5 not having an operational spent fuel pool cooling system, TEPCO has finally replaced the leaking
Read moreMETI considering opening some evacuation areas over Bon holiday http://www.meti.go.jp/earthquake/nuclear/20140722_01.html Iitate Residents File For Arbitration http://www3.nhk.or.jp/nhkworld/english/news/20140722_28.html Former Tomioka mayor dies
Read moreNHK is reporting that the groundwater bypass system being used by TEPCO isn’t making a significant change in groundwater levels
Read moreA new study of Japanese snow monkeys shows that they may be suffering from damage from radiation exposure. Researchers found
Read moreThe manufacturer that sold TEPCO used bolt together tanks for use at Fukushima Daiichi said that the tanks were known
Read moreUpdate: Added table of sea water data at the end and another TEPCO handout on the work released this week.
Read moreTEPCO admitted today that the plant is still releasing 10 million becquerels per hour to the atmosphere. This is in
Read moreTEPCO has announced their plan to remove the cover of unit 1 so that debris on the refueling floor can
Read moreWork has begun, to concrete over the port at Fukushima Daiichi for a second time. Initial work to concrete over
Read moreJapan’s NRA gave an initial approval towards the Sendai nuclear plant meeting government “safety standards”. There are still other aspects
Read moreMore information has come out about the contamination caused by the demolition work on unit 3. It was not the
Read moreTEPCO has admitted to re-contaminating the area around Minamisoma after being confronted by the agriculture ministry. Rice in Minamisoma was
Read moreTEPCO again has posted no information about the needed repair of the spent fuel pool cooling system on unit 5
Read moreWorkers for TEPCO have been leaving at a rapid pace. Between cuts in pay and the social stigma of working
Read moreTEPCO still has not given any further information about the needed repair of the leaking valve for the main cooling
Read moreSome Okuma residents have given up on the idea of returning home and are requesting compensation for their property. http://www3.nhk.or.jp/nhkworld/english/news/20140704_04.html
Read moreUnit 5 continues to operate on shared cooling with the reactor vessel. Graphs of hourly temperature data pulled today show
Read moreThe 6.8 quake in Japan on early Saturday morning generated tsunami warnings and caused a few evacuations. So far no
Read moreTEPCO switched the unit 5 spent fuel pool over to sharing the cooling system for the reactor (the
Read moreThe July 9th reading for monitoring well 1-2 at the sea front had this startling reading. 39,000,000 bq/liter of beta
Read moreTEPCO’s statements earlier this week that they would use a back and forth method of cooling the spent fuel pool
Read moreTEPCO reported to NHK that they are preparing for the incoming tropical storm. Cranes and tank weirs have been prepped
Read moreTEPCO is claiming a small water flow of 2 milliliters per minute is causing the frozen wall installation in cable
Read moreAsahi Shimbun has finally released a translation of the Yoshida testimony on the Fukushima Disaster. The interviews caused controversy when
Read more