Fukushima Unit 1 Robot Failure, What We Know So Far
Per Yahoo News Japan, the robot died about 2/3 of the way through the planned route. Specifics about what kind
Read morePer Yahoo News Japan, the robot died about 2/3 of the way through the planned route. Specifics about what kind
Read moreKyodo News is reporting the robot died inside unit 1’s containment during the inspection. It stopped functioning part way through
Read moreTEPCO reports that the work is underway and released three images of the robot being inserted into the containment structure.
Read moreAccording to a recently released handout from TEPCO and IRID the robot inspection of unit 1’s containment should commence around
Read moreAP is reporting that Fukushima Daiichi unit 1 will get the first of three anticipated containment inspections in early April
Read moreIRID reports progress on the new robot that will be used to attempt to look inside the reactor pedestal of
Read moreHitachi GE conducted robot investigations into unit 2’s torus room on July 17th. The main focus of the work was
Read moreTwo robots, sponsored by IRID conducted an investigation of unit 1. The areas between the 2nd and 3rd floors have
Read moreIRID has announced ongoing testing work on four new robots to be used to inspect inside reactors at Fukushima Daiichi.
Read moreTwo newer underwater robots are being used to inspect the torus rooms of units 1 and 2. The robots built
Read moreWhat are they doing? TEPCO & Hitachi are apparently looking for damage to the vacuum breaker pipes that run in
Read moreWork has begun towards implementing a way to remove the melted fuel at Fukushima Daiichi. It was reported earlier this
Read moreDetails of the new upcoming effort to investigate the containment structures of the melted reactors at Fukushima Daiichi have been
Read moreThe Warrior robot tipped over and remains stranded on the unit 2 refueling floor. The robot was inserted through the
Read moreKyodo is reporting a 3cm hole in the unit 2 torus. TEPCO claims that water is leaking out through this
Read moreTEPCO announced they will begin work to explore the best method to remove spent fuel from unit 2. Since the
Read moreThe ultrasound robot has been run inside unit 2 to attempt to determine the water level for the torus tube.
Read moreTEPCO has done test runs with the ultrasound robot intended to detect the water level inside the torus tubes at
Read moreTEPCO has done an inspection of Unit 1’s torus room, this time with a floating robot boat. TEPCO released most
Read moreTEPCO and Hitachi are working on a floating robot to inspect the torus area of the damaged reactors. The new
Read moreTEPCO plans to build a mock reactor in Fukushima to work out issues related to removing fuel and dismantling the
Read moreTEPCO has completed the last portion of the investigation of the torus and downcomer pipes in unit 2. The walking
Read moreTEPCO inspected another section of the torus of unit 2 today. It appears TEPCO intends to eventually inspect the entire
Read moreTEPCO sent robot Quince 2 into unit 3 at Daiichi to inspect the TIPS room. Damage to some of the
Read moreWe have about 140 images from the video investigation of unit 2 on April 18 using the Topy robot. The
Read moreTEPCO has released two photos and no other details of the robot investigation into the torus room (suppression chamber) area
Read moreTepco has stated they will send a robot into the suppression pool area of unit 2 to check for damage.
Read moreWorkers sent a robot into unit 2 on the ground floor again. This time it went into the TIPS room.
Read moreThe Survey Runner built by Topy Industries will be sent to Fukushima for use in taking photos and radiation levels.
Read more