Fukushima Unit 2 Containment Inspection, What You Need To Know
IRID released a report late in December, 2016 that outlines in great detail, the technical tasks involved in the upcoming
Read moreIRID released a report late in December, 2016 that outlines in great detail, the technical tasks involved in the upcoming
Read moreTEPCO published a photo with a short explanation and no handout document. The image shows what TEPCO describes as a
Read moreIRID has published a new plan to complete phase 2 of the robot containment inspection of unit 1 at Fukushima
Read moreTEPCO is reporting that the effort to put a robot into unit 2’s containment has been delayed further. Work to
Read more3D inspections of the unit 3 torus room are set to begin December 22nd. This work is expected to investigate
Read moreTEPCO sent the small 3D printed robot equipped with a smart phone into inspect the unit 3 containment hatch a
Read moreA new inspection attempt of the unit 1 TIPS room has been completed between September and October of 2015. TEPCO
Read moreTEPCO has released a set of images taken inside the containment structure of unit 3 on March 20th. This is
Read moreTEPCO quietly announced that October 20th they would conduct the first containment inspection of unit 3. This is significant work
Read moreTEPCO announced that the problems created by the stuck shielding blocks and high radiation in the work area will require
Read moreThe containment robot inspection of unit 2 has been rescheduled for November. Efforts to remove shielding blocks around the X-6
Read moreBWR RESTART FOLLOWING EXTENDED SHUTDOWN By Dean Wilkie All of the reactors in Japan were shut down subsequent to the
Read moreA newly released document shows progress in the effort to inspect inside unit 2’s containment. At unit 1 they went
Read moreTEPCO is reporting that the second robot has been put into containment and made 6 of the 11 data stops
Read moreHitachi’s shape changing robot (at least one of them, they have more) is abandoned and dead inside the containment of
Read moreKyodo News is reporting the robot died inside unit 1’s containment during the inspection. It stopped functioning part way through
Read moreTEPCO and IRID recently published details on the first efforts to probe the unit 3 reactor at Fukushima Daiichi. In
Read moreAccording to a recently released handout from TEPCO and IRID the robot inspection of unit 1’s containment should commence around
Read moreAP is reporting that Fukushima Daiichi unit 1 will get the first of three anticipated containment inspections in early April
Read moreIRID reports progress on the new robot that will be used to attempt to look inside the reactor pedestal of
Read moreHitachi GE conducted robot investigations into unit 2’s torus room on July 17th. The main focus of the work was
Read moreTwo robots, sponsored by IRID conducted an investigation of unit 1. The areas between the 2nd and 3rd floors have
Read moreTwo newer underwater robots are being used to inspect the torus rooms of units 1 and 2. The robots built
Read moreWhat are they doing? TEPCO & Hitachi are apparently looking for damage to the vacuum breaker pipes that run in
Read moreTEPCO released a small selection of images of some of the fuel removed from the unit 4 spent fuel pool.
Read moreTEPCO completed an initial inspection of the unit 3 MSIV room that houses valves critical to shutting down the reactor.
Read moreKyodo is reporting a 3cm hole in the unit 2 torus. TEPCO claims that water is leaking out through this
Read moreTEPCO announced they will begin work to explore the best method to remove spent fuel from unit 2. Since the
Read moreThe ultrasound robot has been run inside unit 2 to attempt to determine the water level for the torus tube.
Read moreTEPCO has begun a seismic review of the condition of unit 3. With the debris removed from the refueling floor,
Read moreTEPCO has done an inspection of Unit 1’s torus room, this time with a floating robot boat. TEPCO released most
Read moreTEPCO finally released the video of the pedestal inspection of unit 2. This showed more than the initial images given
Read moreThe image above is the first glimpse of the right side of the pedestal opening for the CRD drive. This
Read moreTEPCO did a robot inspection of the MSIV room of unit 2. No video of the work has been released
Read moreOi will receive an interim safety check by the NRA as part of a plan to allow them to operate
Read moreTEPCO has completed the last portion of the investigation of the torus and downcomer pipes in unit 2. The walking
Read moreNew work done around February 21 to 22 has been posted by TEPCO and confirmed by workers. The newest work
Read moreJapan’s NRA declared a fault under the Tsuruga nuclear plant to be active recently. Since Japan’s laws prohibit a nuclear
Read moreTEPCO reports the results of a robot inspection in unit 3 at Fukushima Daiichi. The initial work was to look
Read moreTEPCO did another inspection of unit 1. They previously used a balloon that looked like a beach ball to float
Read more