Waste Storage Tanks At Fukushima Daiichi At Risk Of Explosion

Filter waste containers stored at Fukushima Daiichi are at risk of having hydrogen explosions. TEPCO released documents on Friday detailing

Read more

Japan Takes S. Korea To WTO Over Fukushima Food Bans

Japan has filed a WTO trade complaint against South Korea for restricting potentially contaminated Japanese food from entering their market.

Read more

SimplyInfo.org Report: Taiwan Food Testing Of Japanese Imports

Thanks to activists in Japan, we were made aware of ongoing Japanese food import testing being conducted in Taiwan. The

Read more

Fukushima Daiichi Frozen Wall Begins Freezing Operations

TEPCO’s contractors have begun the process of freezing the completed sections of the frozen wall. Blocks 1-8 are currently in

Read more

TEPCO Refused To Upgrade From Windows XP At Fukushima Daiichi

Japan’s NRA has publicly urged TEPCO to upgrade computer systems used at Fukushima Daiichi, and possibly company wide. NRA pointed

Read more

SimplyInfo.org; WIPP REPORT April 2015

1. Radiation survey of the underground No complete radiation survey of the underground areas has been released to date. These

Read more

Report On Fukushima Unit 1 Containment Inspection 2015

Hitachi’s shape changing robot (at least one of them, they have more) is abandoned and dead inside the containment of

Read more

Fukushima Unit 1 Containment Inspection Conducted

TEPCO reports that the work is underway and released three images of the robot being inserted into the containment structure.

Read more

IRID Fukushima Fuel Debris Research Progress Reports

IRID published English language versions of their fuel debris removal and other new technology research reports. Various contractors were hired to

Read more

US Lax Regulations On Japan Food Imports Raise More Concerns As TPP Close To A Vote

A recent Japanese food mislabeling scandal in Taiwan showed the differing levels of oversight between countries when it comes to

Read more

Fukushima Daiichi Unit 1 Containment Inspection Starts April 10th

According to a recently released handout from TEPCO and IRID the robot inspection of unit 1’s containment should commence around

Read more